* merge networkdays, networkdays.intl #33 * merge time, timevalue, hour, minute, second #35 * merge datedif, datevalue #36 * merge days, days360, weekday, weeknum, workday, workday.intl, yearfrac, isoweeknum #41 * from excel helper * fix build * date time macros * de-dupe weekend * serial helper * de-dupe now today * weekend pattern enum * remove unused clippy wrong self * fix docs * add test coverage * fix build * fix cursor comment * PR coments + xlsx date time
This commit is contained in:
@@ -4,9 +4,73 @@ outline: deep
|
||||
lang: en-US
|
||||
---
|
||||
|
||||
# NETWORKDAYS.INTL
|
||||
# NETWORKDAYS.INTL function
|
||||
|
||||
::: warning
|
||||
🚧 This function is not yet available in IronCalc.
|
||||
[Follow development here](https://github.com/ironcalc/IronCalc/labels/Functions)
|
||||
:::
|
||||
**Note:** This draft page is under construction 🚧
|
||||
:::
|
||||
|
||||
## Overview
|
||||
NETWORKDAYS.INTL is a function of the Date and Time category that calculates the number of working days between two dates, with customizable weekend definitions and optionally specified holidays.
|
||||
|
||||
## Usage
|
||||
|
||||
### Syntax
|
||||
**NETWORKDAYS.INTL(<span title="Number" style="color:#1E88E5">start_date</span>, <span title="Number" style="color:#1E88E5">end_date</span>, [<span title="Number or String" style="color:#4CAF50">weekend</span>], [<span title="Array" style="color:#E91E63">holidays</span>]) => <span title="Number" style="color:#1E88E5">workdays</span>**
|
||||
|
||||
### Argument descriptions
|
||||
* *start_date* ([number](/features/value-types#numbers), required). The start date expressed as a [serial number](/features/serial-numbers.md).
|
||||
* *end_date* ([number](/features/value-types#numbers), required). The end date expressed as a [serial number](/features/serial-numbers.md).
|
||||
* *weekend* ([number](/features/value-types#numbers) or [string](/features/value-types#strings), optional). Defines which days are considered weekends. Default is 1 (Saturday-Sunday).
|
||||
* *holidays* ([array](/features/value-types#arrays) or [range](/features/ranges), optional). A list of dates to exclude from the calculation, expressed as serial numbers.
|
||||
|
||||
### Weekend parameter options
|
||||
The _weekend_ parameter can be specified in two ways:
|
||||
|
||||
**Numeric codes:**
|
||||
- 1 (default): Saturday and Sunday
|
||||
- 2: Sunday and Monday
|
||||
- 3: Monday and Tuesday
|
||||
- 4: Tuesday and Wednesday
|
||||
- 5: Wednesday and Thursday
|
||||
- 6: Thursday and Friday
|
||||
- 7: Friday and Saturday
|
||||
- 11: Sunday only
|
||||
- 12: Monday only
|
||||
- 13: Tuesday only
|
||||
- 14: Wednesday only
|
||||
- 15: Thursday only
|
||||
- 16: Friday only
|
||||
- 17: Saturday only
|
||||
|
||||
**String pattern:** A 7-character string of "0" and "1" where "1" indicates a weekend day. The string represents Monday through Sunday. For example, "0000011" means Saturday and Sunday are weekends.
|
||||
|
||||
### Additional guidance
|
||||
- If the supplied _start_date_ and _end_date_ arguments have fractional parts, NETWORKDAYS.INTL uses their [floor values](https://en.wikipedia.org/wiki/Floor_and_ceiling_functions).
|
||||
- If _start_date_ is later than _end_date_, the function returns a negative number.
|
||||
- Empty cells in the _holidays_ array are ignored.
|
||||
- The calculation includes both the start and end dates if they are workdays.
|
||||
|
||||
### Returned value
|
||||
NETWORKDAYS.INTL returns a [number](/features/value-types#numbers) representing the count of working days between the two dates.
|
||||
|
||||
### Error conditions
|
||||
* In common with many other IronCalc functions, NETWORKDAYS.INTL propagates errors that are found in its arguments.
|
||||
* If fewer than 2 or more than 4 arguments are supplied, then NETWORKDAYS.INTL returns the [`#ERROR!`](/features/error-types.md#error) error.
|
||||
* If the *start_date* or *end_date* arguments are not (or cannot be converted to) [numbers](/features/value-types#numbers), then NETWORKDAYS.INTL returns the [`#VALUE!`](/features/error-types.md#value) error.
|
||||
* If the *start_date* or *end_date* values are outside the valid date range, then NETWORKDAYS.INTL returns the [`#NUM!`](/features/error-types.md#num) error.
|
||||
* If the *weekend* parameter is an invalid numeric code or an improperly formatted string, then NETWORKDAYS.INTL returns the [`#NUM!`](/features/error-types.md#num) or [`#VALUE!`](/features/error-types.md#value) error.
|
||||
* If the *holidays* array contains non-numeric values, then NETWORKDAYS.INTL returns the [`#VALUE!`](/features/error-types.md#value) error.
|
||||
|
||||
<!--@include: ../markdown-snippets/error-type-details.txt-->
|
||||
|
||||
## Details
|
||||
IronCalc utilizes Rust's [chrono](https://docs.rs/chrono/latest/chrono/) crate to implement the NETWORKDAYS.INTL function. This function provides more flexibility than NETWORKDAYS by allowing custom weekend definitions.
|
||||
|
||||
## Examples
|
||||
[See some examples in IronCalc](https://app.ironcalc.com/?example=networkdays-intl).
|
||||
|
||||
## Links
|
||||
* See also IronCalc's [NETWORKDAYS](/functions/date_and_time/networkdays.md) function for the basic version with fixed weekends.
|
||||
* Visit Microsoft Excel's [NETWORKDAYS.INTL function](https://support.microsoft.com/en-us/office/networkdays-intl-function-a9b26239-4f20-46a1-9ab8-4e925bfd5e28) page.
|
||||
* Both [Google Sheets](https://support.google.com/docs/answer/3093019) and [LibreOffice Calc](https://wiki.documentfoundation.org/Documentation/Calc_Functions/NETWORKDAYS.INTL) provide versions of the NETWORKDAYS.INTL function.
|
||||