### Phase 1: Critical/High Priority
1. ~~Tasks App: Fix table display~~ (DONE)
2. Sync: Parallelize message downloads
3. Mail: Replace hardcoded RGB colors
4. Mail: Remove envelope icon/checkbox gap
5. Calendar: Current time hour line styling
6. IPC: Implement cross-app refresh notifications
2. ~~Sync: Parallelize message downloads~~ (DONE - connection pooling + batch size increase)
3. ~~Mail: Replace hardcoded RGB colors~~ (DONE - already using theme variables)
4. ~~Mail: Remove envelope icon/checkbox gap~~ (DONE)
5. ~~Calendar: Current time hour line styling~~ (DONE - added surface background)
6. ~~IPC: Implement cross-app refresh notifications~~ (DONE)
### Phase 2: Medium Priority
1. Sync: Default to TUI mode